{"id":1421,"date":"2026-03-01T16:47:53","date_gmt":"2026-03-01T15:47:53","guid":{"rendered":"http:\/\/strojrem.com\/?p=1421"},"modified":"2026-03-04T11:36:36","modified_gmt":"2026-03-04T10:36:36","slug":"technological-conveyor-equipment-for-transporting-wood-pellets-customer-project-in-hungary","status":"publish","type":"post","link":"https:\/\/strojrem.com\/hr\/technological-conveyor-equipment-for-transporting-wood-pellets-customer-project-in-hungary\/","title":{"rendered":"Technological Conveyor Equipment for Transporting Wood Pellets \u2013 Customer Project in Hungary"},"content":{"rendered":"<p>These technological mechanical installation works at the energy production site have been successfully completed. <a href=\"https:\/\/www.youtube.com\/watch?v=TYIO1q7fwv4\" target=\"_blank\" rel=\"noopener\">Video of transport system in operation at final customer site<\/a>.<\/p>\n\n\n\n<p>The photo shows the fully installed large-scale conveyor system at its final location at the end customer\u2019s facility in Hungary. The system has been assembled, finalized, and prepared for commissioning.<\/p>\n\n\n\n<p>The project involved the storage, separation, and dosing of fuel for a wood-chip power plant and included the complete design and engineering of the system, the supply of the steel structure, the manufacturing and delivery of the required equipment, as well as the installation of electrical equipment and the implementation of line control with PLC programming.<\/p>\n\n\n\n<p>The conveyor system is designed for the efficient and reliable transport of wood pellets within the energy production process, ensuring continuous material flow and optimized operational performance.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Production year: 2025<\/li>\n\n\n\n<li>Mobile Conveyor<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"938\" data-id=\"1586\" src=\"https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/Bulk-material-transport-1024x938.jpg\" alt=\"Bulk material transport\" class=\"wp-image-1586\" srcset=\"https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/Bulk-material-transport-1024x938.jpg 1024w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/Bulk-material-transport-300x275.jpg 300w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/Bulk-material-transport-768x703.jpg 768w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/Bulk-material-transport-13x12.jpg 13w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/Bulk-material-transport.jpg 1118w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"796\" height=\"597\" data-id=\"1590\" src=\"https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/transport-peleta-madzarska.jpg\" alt=\"transport peleta mad\u017earska\" class=\"wp-image-1590\" srcset=\"https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/transport-peleta-madzarska.jpg 796w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/transport-peleta-madzarska-300x225.jpg 300w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/transport-peleta-madzarska-768x576.jpg 768w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/transport-peleta-madzarska-16x12.jpg 16w\" sizes=\"auto, (max-width: 796px) 100vw, 796px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1020\" height=\"765\" data-id=\"1591\" src=\"https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/transport-peleta.jpg\" alt=\"transport peleta\" class=\"wp-image-1591\" srcset=\"https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/transport-peleta.jpg 1020w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/transport-peleta-300x225.jpg 300w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/transport-peleta-768x576.jpg 768w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/transport-peleta-16x12.jpg 16w\" sizes=\"auto, (max-width: 1020px) 100vw, 1020px\" \/><\/figure>\n<\/figure>","protected":false},"excerpt":{"rendered":"<p>These technological mechanical installation works at the energy production site have been successfully completed. Video of transport system in operation at final customer site. The photo shows the fully installed large-scale conveyor system at its final location at the end customer\u2019s facility in Hungary. The system has been assembled, finalized, and prepared for commissioning. The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1421","post","type-post","status-publish","format-standard","hentry","category-novice"],"_links":{"self":[{"href":"https:\/\/strojrem.com\/hr\/wp-json\/wp\/v2\/posts\/1421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/strojrem.com\/hr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/strojrem.com\/hr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/strojrem.com\/hr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/strojrem.com\/hr\/wp-json\/wp\/v2\/comments?post=1421"}],"version-history":[{"count":10,"href":"https:\/\/strojrem.com\/hr\/wp-json\/wp\/v2\/posts\/1421\/revisions"}],"predecessor-version":[{"id":1595,"href":"https:\/\/strojrem.com\/hr\/wp-json\/wp\/v2\/posts\/1421\/revisions\/1595"}],"wp:attachment":[{"href":"https:\/\/strojrem.com\/hr\/wp-json\/wp\/v2\/media?parent=1421"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/strojrem.com\/hr\/wp-json\/wp\/v2\/categories?post=1421"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/strojrem.com\/hr\/wp-json\/wp\/v2\/tags?post=1421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}