{"id":1460,"date":"2026-03-01T22:07:45","date_gmt":"2026-03-01T21:07:45","guid":{"rendered":"http:\/\/strojrem.com\/?p=1460"},"modified":"2026-03-02T15:49:23","modified_gmt":"2026-03-02T14:49:23","slug":"new-transformer-assembly-line-coming-soon-to-bulgaria","status":"publish","type":"post","link":"https:\/\/strojrem.com\/hu\/new-transformer-assembly-line-coming-soon-to-bulgaria\/","title":{"rendered":"\u00daj transzform\u00e1tor-\u00f6sszeszerel\u0151 sor hamarosan Bulg\u00e1ri\u00e1ban"},"content":{"rendered":"<p>We are pleased to announce the upcoming delivery of our latest transformer assembly line to Bulgaria.<\/p>\n\n\n\n<p>This modern assembly line is designed for transformers weighing up to 3.5 tons, ensuring efficiency and reliability throughout the production process. The system includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>14 workstations<\/li>\n\n\n\n<li>20 buffer positions<\/li>\n\n\n\n<li>5 rotating tables<\/li>\n<\/ul>\n\n\n\n<p>This configuration provides high flexibility and productivity. The complete line is equipped with an advanced control system that guarantees optimal monitoring and management of all operational processes.<\/p>\n\n\n\n<p>We expect this solution to significantly enhance the production capacity of our client in Bulgaria and elevate their manufacturing performance to a higher level.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"1463\" src=\"https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/odprema-linije-za-Bolgarijo-1024x768-1.jpg\" alt=\"\" class=\"wp-image-1463\" srcset=\"https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/odprema-linije-za-Bolgarijo-1024x768-1.jpg 1024w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/odprema-linije-za-Bolgarijo-1024x768-1-300x225.jpg 300w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/odprema-linije-za-Bolgarijo-1024x768-1-768x576.jpg 768w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/odprema-linije-za-Bolgarijo-1024x768-1-16x12.jpg 16w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"1462\" src=\"https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/linija-strojrem-1024x768-1.jpg\" alt=\"\" class=\"wp-image-1462\" srcset=\"https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/linija-strojrem-1024x768-1.jpg 1024w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/linija-strojrem-1024x768-1-300x225.jpg 300w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/linija-strojrem-1024x768-1-768x576.jpg 768w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/linija-strojrem-1024x768-1-16x12.jpg 16w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"1461\" src=\"https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/Strojrem-oprema-doprema-1024x768-1.jpg\" alt=\"\" class=\"wp-image-1461\" srcset=\"https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/Strojrem-oprema-doprema-1024x768-1.jpg 1024w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/Strojrem-oprema-doprema-1024x768-1-300x225.jpg 300w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/Strojrem-oprema-doprema-1024x768-1-768x576.jpg 768w, https:\/\/strojrem.com\/wp-content\/uploads\/2026\/03\/Strojrem-oprema-doprema-1024x768-1-16x12.jpg 16w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>","protected":false},"excerpt":{"rendered":"<p>We are pleased to announce the upcoming delivery of our latest transformer assembly line to Bulgaria. This modern assembly line is designed for transformers weighing up to 3.5 tons, ensuring efficiency and reliability throughout the production process. The system includes: This configuration provides high flexibility and productivity. The complete line is equipped with an advanced [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1464,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1460","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novice"],"_links":{"self":[{"href":"https:\/\/strojrem.com\/hu\/wp-json\/wp\/v2\/posts\/1460","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/strojrem.com\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/strojrem.com\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/strojrem.com\/hu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/strojrem.com\/hu\/wp-json\/wp\/v2\/comments?post=1460"}],"version-history":[{"count":1,"href":"https:\/\/strojrem.com\/hu\/wp-json\/wp\/v2\/posts\/1460\/revisions"}],"predecessor-version":[{"id":1465,"href":"https:\/\/strojrem.com\/hu\/wp-json\/wp\/v2\/posts\/1460\/revisions\/1465"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/strojrem.com\/hu\/wp-json\/wp\/v2\/media\/1464"}],"wp:attachment":[{"href":"https:\/\/strojrem.com\/hu\/wp-json\/wp\/v2\/media?parent=1460"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/strojrem.com\/hu\/wp-json\/wp\/v2\/categories?post=1460"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/strojrem.com\/hu\/wp-json\/wp\/v2\/tags?post=1460"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}